For supplier quality & APQP engineers PPAP & PFMEA

PFMEA and Control Plan — Checked Against Each Other

Track all 18 PPAP elements by submission level, build the PFMEA with AIAG-VDA action priority worked out, and turn it into the control plan in one click.

  • ✓ AIAG-VDA action priority — High, Medium or Low, not RPN math
  • ✓ Control plan rows made from the PFMEA in one click
  • ✓ Every uncovered special characteristic flagged before it's sent
Start free trial → 14-day free trial · no credit card needed
Part #4471-B Submission Level 3
PFMEA line High priority
→
Control plan Covered
→
PPAP status Ready
What's inside

PPAP, PFMEA and the control plan, finally in one place

✓

18 PPAP elements

By submission level, 1 to 5 — level 3 sends everything except master sample and checking aids.

▲

AIAG-VDA action priority

High, Medium or Low from severity, occurrence and detection — RPN still shown alongside.

+

Control plan in one click

Rows made straight from the PFMEA, flagging any line left uncovered.

✓

Owners & due dates

On every element and action, so nothing sits unassigned.

▲

Import your PFMEA

Upload the spreadsheet; merged cells for process step and failure mode fill down for you.

+

Send the package

PPAP status, PFMEA and control plan as one PDF, or an Excel workbook for the customer's forms.

The overview

Every part, its submission level and what's still open

portal.ifactoryai.com/dashboard/ppap-pfmea
PPAP and PFMEA overview dashboard

The overview, with sample records: parts, submission levels, and open PFMEA actions.

How it works

From the part list to the package you send

1

Add your parts

Each part at its submission level. Import the PFMEA spreadsheet you already have, or start from a sample.

2

Work through it together

Owners and due dates on every element and action; the action priority and control plan gaps are worked out for you.

3

Send the package

Print the PFMEA, control plan and PPAP status for the customer, or download them to Excel.

A closer look

Where the package actually comes together

Add a part screen in PPAP and PFMEA

Add your parts

Each part at its submission level, 1 to 5 — the level decides which of the 18 elements are sent to the customer and which stay on file.

  • ✓ Level 3, the usual default, skips master sample and checking aids
  • ✓ Import an existing PFMEA spreadsheet straight onto the part
  • ✓ Or start from a sample part to see the workflow first
Open PFMEA action screen in PPAP and PFMEA

Action priority & open actions

Each line ranked High, Medium or Low from its severity, occurrence and detection ratings — not multiplied into an RPN, though the RPN still shows alongside.

  • ✓ A High line needs an action, or a recorded reason controls are enough
  • ✓ Owners and due dates on every open action
  • ✓ Nothing closes without something behind it
Parts list screen in PPAP and PFMEA

Parts & control plan status

Every part, its submission level and whether its control plan actually covers what the PFMEA found.

  • ✓ Control plan rows made from the PFMEA in one click
  • ✓ Any special characteristic or High line with no control, flagged
  • ✓ The mismatch that gets packages rejected, caught before it's sent
Included with every tool

No separate add-ons to buy

✓

Your whole team

Invite colleagues; owners and admins manage access.

✓

iFactory AI

Ask questions and get answers from your own records.

✓

Your data stays yours

Export everything to Excel or PDF, any time.

✓

Hosted in the United States

Each company's records are kept separate.

Who it's for

Built for suppliers who live inside a PPAP cycle

Automotive suppliers

AIAG PPAP and AIAG-VDA FMEA, the forms most OEM customers expect.

Tier 1 & Tier 2 plants

Multiple parts, each at its own submission level, tracked in one place.

Supplier quality teams

Owners and due dates across every open action, not scattered spreadsheets.

APQP & launch engineers

PFMEA and control plan kept in step from the first submission onward.

What changes

What's different once it's running

Before it's sent

A mismatch between the PFMEA and the control plan is caught here, not by the customer.

No separate files

The PFMEA, control plan and PPAP status stop living in three different spreadsheets.

High risks don't sit idle

Every High-priority line has an action or a recorded reason — never just left open.

Fewer packages rejected

Special characteristics without a control are flagged before the customer sees them.

Questions

Before you start the trial

If something's missing here, a quick call usually answers it faster than a help page.

Can I import our existing PFMEA?
Yes. Upload the spreadsheet, match the columns once, and its lines are added to the part — merged cells for the process step and failure mode are filled down for you. Start a free trial to try it with your own file.
Does it still show the RPN?
Yes. Each line shows its action priority and its RPN, since some customers still ask for it.
What can we send the customer?
A PPAP package PDF with the element status, the PFMEA and the control plan, or each on its own, and an Excel workbook of the PFMEA and control plan for the customer's own forms. Book a demo to see a sample package.
Can I bring my existing PFMEA?
Yes. Upload the spreadsheet, match the columns once, and its lines are added to the part, merged cells and all. Then make the control plan from it in one click.
Who can see our records?
Only people in your company. Each company's records are kept separate, and every change is logged.
What happens after the trial?
PPAP & PFMEA is on our plans: Pro $19 or Agentic $49 per user / month, and also inside Quality Management (all 3 apps in one app). Choose either on any day of the trial and your plan starts at once. Without one, your workspace becomes read-only: every record is kept, and you can still view and download it.
✓ 0 special characteristics left uncovered

Try PPAP & PFMEA free for 14 days

No card needed. Bring your PFMEA spreadsheet and be running in minutes.

Start free trial →
✓ PPAP Package
PFMEALinked
Control planLinked
18 elementsReady