For maintenance planners & supervisors PM Scheduler

PMs Due by Date or Meter — Whichever Comes First

List each asset's PM plans, see what's overdue or due this week, print the PM sheet, and mark it done or skipped — with compliance tracked by month and by asset.

  • ✓ Due list split into Overdue, Due this week and Next 30 days
  • ✓ Printable PM sheet with tasks, parts and a QR code
  • ✓ PM compliance %, by month and by asset
Start free trial → 14-day free trial · no credit card needed
At a glance · This month
91% PM compliance
PMs done on time, across all assets
4Overdue
11Due this week
37Next 30 days
Conveyor line96%
Compressors88%
Forklifts80%
  • ✓ Due by date, meter, or whichever comes first
  • ✓ PM sheet with QR code, opens on a phone
  • ✓ Done or skipped, with reason, kept in history
What's inside

Preventive maintenance, off the wall planner and into one record

✓

PM plans per asset

Every 3 months, every 500 run hours, or whichever comes first.

▲

Meter readings

Log run hours, km or cycles; the app learns usage and predicts when a PM falls due.

+

One due list

Overdue, due this week and the next 30 days, grouped by asset.

✓

Printable PM sheet

Tasks, parts and tools, a signature box, and a QR code to open it on a phone.

▲

Done or skipped

Mark it done with hours and notes, or skipped with a reason — either way it's on record.

+

PM compliance

Share done on time, by month and by asset, as PDF or CSV.

The overview

Every asset, every plan, one place to check what's due

portal.ifactoryai.com/dashboard/pm-scheduler
PM Scheduler overview dashboard

The overview, with sample records: assets, plans and what's due across the plant.

How it works

From the asset list to the compliance report

1

List your assets and their PMs

Each asset with its plans: every 3 months, every 500 run hours or every 10,000 km, whichever comes first. Import a spreadsheet or start from the sample.

2

See what's due and print the sheet

What's due this week and what's overdue, with a printable PM sheet of each plan's tasks and parts.

3

Mark it done and track compliance

Mark each PM done or skipped with a reason; compliance shows how many were done on time, by month and by asset.

A closer look

Where the planning actually happens

PM Scheduler plan setup screen

PM plans

Lubricate the conveyor every month, change the compressor oil every 500 run hours, service the forklift every 3 months or 250 hours — whichever comes first.

  • ✓ Each plan carries its tasks, parts, tools and usual owner
  • ✓ Counts from its due date, or from the day it was last done
  • ✓ A meter reading below the last one is refused unless replaced
PM Scheduler due list screen

The due list

Every PM in three groups — overdue, due this week and the next 30 days — by asset.

  • ✓ A meter PM shows the day it's expected, not just the reading
  • ✓ Mark Done with notes, hours and the meter reading
  • ✓ Or mark Skipped with a reason — the plan moves on either way
PM Scheduler compliance report screen

PM compliance

The share of PMs done on time, by month and by asset — on time meaning by the due date plus the grace days you set.

  • ✓ A skip always counts as not done on time
  • ✓ History keeps who, when, notes, hours and skip reasons
  • ✓ Download as CSV, or the compliance report as PDF
Included with every tool

No separate add-ons to buy

✓

Your whole team

Invite colleagues; owners and admins manage access.

✓

iFactory AI

Ask questions and get answers from your own records.

✓

Your data stays yours

Export everything to Excel or PDF, any time.

✓

Hosted in the United States

Each company's records are kept separate.

Who it's for

Built for plants running PMs off a calendar or a meter

Manufacturing plants

Conveyors, compressors and production equipment on a fixed PM rhythm.

Fleet & mobile equipment

Forklifts and vehicles due by km or run hours as much as by date.

Facilities teams

HVAC, generators and building systems with seasonal and run-time PMs.

Growing maintenance teams

Starting on PMs alone, with Maintenance & Inspection ready when they need more.

What changes

What's different once it's running

Nothing missed

A busy week doesn't quietly drop a PM — overdue sits at the top of the list.

Off the wall planner

No more wall chart or spreadsheet to keep in sync by hand.

A real answer

"How many PMs were done on time last quarter" has a number, not a guess.

Nothing to redo

Move up to Maintenance & Inspection and every plan, reading and record is already there.

Questions

Before you start the trial

If something's missing here, a quick call usually answers it faster than a help page.

Can a PM be due by run hours and by date at once?
Yes. Choose whichever comes first and give it both — say every 3 months or every 250 hours. The meter readings you log and the calendar keep it current, and it's due at the first of the two. Start a free trial to set one up.
What happens when a PM is skipped?
You choose the reason — the asset wasn't running, out of service, covered by other work, no access, no parts — and can add a note. It's kept in History, the plan moves on to its next date, and it counts as not done on time. Book a demo to see the reasons in full.
Does it need a work order system or any AI?
No. PM Scheduler works on its own: plans, the due list, done or skipped, history and the reports. It needs no AI to run.
Do I keep my plans if I move up to Maintenance & Inspection?
Yes. Both run on the same records, so every asset, plan, meter reading and PM done or skipped is there, and your old links open the same pages.
Can we try it before adding our own assets?
Yes. Load the sample data first — a small plant's plans and three months of history — before you add your own. Start the trial to load it, or book a demo first.
What happens after the trial?
PM Scheduler is on our plans: Pro $19 or Agentic $49 per user / month. Choose either on any day of the trial and your plan starts at once. Without one, your workspace becomes read-only: every record is kept, and you can still view and download it.
✓ 91% PM compliance this month

Try PM Scheduler free for 14 days

No card needed. Bring your spreadsheet and be running in minutes.

Start free trial →
✓ PM Sheet
0 overdue
PM #104
Conveyor Line 2
85%
Run hours460 / 500
Due in 3 days — or 40 run hours, whichever first
  • ✓ Lubrication & belt check tasks
  • ✓ Parts & tools listed on the sheet
  • ✓ QR code opens it on a phone
Last PM: Done, on time ✓ Logged